Map Legend

1. Quilcene Complete Streets - Phase 1

2. Four Corners Road to Anderson Lake State Park Olympic Discovery Trail (ODT) - Connection

3. Lords Lake Loop Road - Slide Repair

4. Shine Road - Slide Repair

5. Little Quilcene River Bridge Replacement

6. Oil City Road Engineering Assessment

7. Rhody Drive Pedestrian and Bicycle Improvements - North Segment

8. Rhody Drive Pedestrian and Bicycle Improvements - South Segment

9. Olympic Discovery Trail (ODT) - PS2P Project

10. Hell Roaring Creek Tributary Culvert Replacement, Upper Hoh Road

11. Big Quilcene River Bridge Replacement Project

12. Van Trojen Road - Bituminous Surface Treatment

13. Port Townsend Gateway Project

14. Upper Hoh Road - Dolosse Monitoring

15. Upper Hoh Road Spruce Creek Mitigation

16. Donkey Creek Tributary Culvert Replacement, Clearwater Road

17. Lindner Creek Culvert Replacement, Upper Hoh Road

18. Upper Hoh Road Pavement Preservation - FLAP Project

19. Upper Hoh Road Bank Stabilization - FLAP Project

20. Oil City Road Culvert Replacement (Bridge) MP 0.5 - FLAP Project

21. Center Road Culvert Correction - Chimacum Creek

22. Paradise Bay Road Overlay

23. Rick Tollefson Trail - Ballfield Connection

24. Duckabush Estuary Restoration - Realignment Project

25. Snell Creek Culvert Replacement, Upper Hoh Road

26. Oil City Road Unnamed Tributary - Culvert Replacement

27. Oil City Road Six Mile Creek Culvert Replacement

28. Oil City Road MP 8.8-8.9 Permanent Repair

29. West Valley Road Safe Routes to School Project

30. Yarr Bridge Replacement

31. Quilcene Complete Streets - Phase 2

32. Olympic Discovery Trail (ODT) - West

33. Elsie Lopeman Trail Extension

34. Paradise Bay Road Overlay - Phase 2

35. Countywide Safety Improvements

36. Countywide Bridge Heavy Maintenance Program

37. Countywide Various Road Improvements

38. Tarboo Creek Culverts Replacement Project

Map Legend

Scroll down to see transportation projects

1. Quilcene Complete Streets - Phase 1

Publicly driven pedestrian and bicycle improvements involving US 101 traffic calming, crosswalk improvements, sidewalk, with a focus on connections to the school campus.

Funding status: Secured

Total = $997,500 (WSDOT + $95,660 from PIF)

2. Four Corners Road to Anderson Lake State Park Olympic Discovery Trail (ODT) - Connection

PS&E, ROW and construction of ODT segment connecting the Larry Scott Trail, via Jefferson Transit P&R, to Anderson Lake State Park.

Funding status: Secured

Total = $1,519,332 (FHWA) + $3,810,720 (RCO) + $273,900 (JC Cap funds)

3. Lords Lake Loop Road - Slide Repair

An approximately 300 foot long, 11-12 foot wide realignment to repair an embankment slide that occurred during a 2021 storm event.

Funding Status: Secured

Total = $440,490 (FEMA)

4. Shine Road - Slide Repair

Shift approximately 800 +/- feet of road away from the bluff as a corrective measure following 2021 storm damage. Project also includes potential work to repair riprap.

Funding Status: Secured

Total = $367,152 including $100,000 (FEMA + 100k ARPA)

5. Little Quilcene River Bridge Replacement

Replacement of a 1955, 64-ft. concrete bridge with structural deficiencies, through a FHWA local bridge program grant.

Total = $5,680,128 (FHWA)

6. Oil City Road Engineering Assessment

Local oversight funds for infrastructure protection, planning project performed by FHWA Western Federal Lands division, thru FLAP program.

Funding Status: Secured

Total Federal Lands Access Program (FLAP) = $250,000 (uses toll credits as match)

7. Rhody Drive Pedestrian and Bicycle Improvements - North Segment

Pedestrian & bicycle facilities along SR19 connecting HJ Carroll Park and the Rick Tollefson Trail to existing facilities at the Chimacum Schools Campus.

Funding Status: Partially funded

Total PE Grant= $109,901 (FHWA)

Total CN Grant = $461,135 (TAP)

8. Rhody Drive Pedestrian and Bicycle Improvements - South Segment

Pedestrian & bicycle facilities along SR19 connecting the Chimacum School Campus to the Chimacum Crossroads commercial corridor.

Funding Status: Partially funded

Total PE Grant = $435,041

9. Olympic Discovery Trail (ODT) - PS2P Project

Planning & design project for 5 segments of the ODT: (1) Old Hwy 9 (100% PS&E); Discovery Bay (30% PS&E); Fairmount Rd. to Eaglemount Rd. (10% PS&E); Eaglemount Rd. to Anderson Lake State Park (10% PS&E); Sound to Olympic Trail to ODT (10% PS&E). 

Funding Status: Secured

Jeff. Co. Total = $2,030,000 (of $16,130,000 total FHWA RAISE Grant)

10. Hell Roaring Creek Tributary Culvert Replacement, Upper Hoh Road

A Trout Unlimited project to replace existing double corrugated metal fish barrier culverts with a 4-sided concrete box culvert.

Funding Status: Secured

Total = $1,190,214 (NOAA)

11. Big Quilcene River Bridge Replacement Project

Project will restore a 1.1 mile segment of the Big Quilcene River and adjacent floodplain, including a new 1,100 foot long Linger Longer Bridge.

Funding Status: Secured

Total = $25,000,000 (FHWA RAISE Grant managed by JST & HCSEG)

12. Van Trojen Road - Bituminous Surface Treatment

Project will convert the existing gravel road surface to BST (bituminous surface treatment). Work will be completed by the county road crew.

Funding Status: Secured

Total = $154,600

13. Port Townsend Gateway Project

Joint City, County, WSDOT intersection safety improvement project including South Discovery Road, Jacob Miller Road, Mill Road, and SR20.

Funding Status: Partially Funded

Total = $9,500,000

14. Upper Hoh Road - Dolosse Monitoring

Project to monitor FLAP - Phase 2 funded dolosse installation at three locations along the Upper Hoh Road. Monitoring is required for 15 years.

Funding Status: Secured

Total = $319,900

15. Upper Hoh Road Spruce Creek Mitigation

Environmental mitigation / Permanent repairs in response to 2015 emergency repairs.

Funding Status: Partially Funded

Total = $293,160 (FHWA)

16. Donkey Creek Tributary Culvert Replacement, Clearwater Road

A Trout Unlimited project to replace an existing PCC fish barrier culvert with an aluminum pipe arch culvert.

Funding Status: Partially Funded

Total = $569,722 (84% RCO)

17. Lindner Creek Culvert Replacement, Upper Hoh Road

A Trout Unlimited project to replace an existing corrugated metal fish barrier culvert with a voided slab bridge.

Funding Status: Secured

Total = $2,199,613 (NOAA)

18. Upper Hoh Road Pavement Preservation - FLAP Project

Pavement preservation & safety improvements along Upper Hoh Road to the Hoh Rain Forest/Olympic National Park  boundary. Project performed by FHWA Western Federal Lands division, thru FLAP program..

Funding Status: Secured

Total = $2,907,500 (FLAP) + $408,400 (CRAB RAP)

19. Upper Hoh Road Bank Stabilization - FLAP Project

Approximate location of next critical area of scour along Upper Hoh Road MP 7.9 - 8.2 , providing access to the Hoh Rain Forest/Olympic National Park boundary. Project performed by FHWA Western Federal Lands division, thru FLAP program..

Funding Status: Secured

Total = $4,993,378 (FLAP)

20. Oil City Road Culvert Replacement (Bridge) MP 0.5 - FLAP Project

Local funds for permanent repair of Two Trout Creek washout project performed by FHWA Western Federal Lands division, thru FLAP program.

Funding Status: Secured

Total = $1,828,560 (FLAP)

21. Center Road Culvert Correction - Chimacum Creek

Replace a non-conforming Chimacum Creek culvert with a fish passable structure.

Funding Status: Partially Funded

Total grants = $6,258,129 (RCO-FBRB & FWS-NFPP)

22. Paradise Bay Road Overlay

2R overlay of Paradise Bay Road from Andy Cooper Road to SR104 at the Hood Canal Bridge.

Funding Status: Planned

Total = $1,234,561 (CRAB RAP)

23. Rick Tollefson Trail - Ballfield Connection

Old Hadlock Road and Chimacum Road intersection realignment with multi-use trail connecting Rick Tollefson trail to Bob Bates Fields and Elsie Lopeman Trail.

Funding Status: Planned

Total = $726,722 (WSDOT Ped/Bike Program)

24. Duckabush Estuary Restoration - Realignment Project

Project will replace US 101 causeway with a bridge. Will also realign a segment of Duckabush Road and replace a culvert with a bridge on Shore Road.

Funding Status: Partially Funded

Total: $126 million (WDFW/USACE/WSDOT)

25. Snell Creek Culvert Replacement, Upper Hoh Road

A Trout Unlimited project to replace an existing fish barrier culvert with a pipe arch or 3-sided concrete box culvert.

Funding Status: Partially Funded

Total = $1,946,124 (NOAA)

26. Oil City Road Unnamed Tributary - Culvert Replacement

A Trout Unlimited project to replace an existing PCC fish barrier culvert with a bridge.

Funding Status: Partially Funded

Total = $1,700,000 (PE: Private Grant & CN:NOAA)

27. Oil City Road Six Mile Creek Culvert Replacement

A Trout Unlimited project to replace an existing CMP fish barrier culvert with a concrete box culvert or a bridge.

Funding Status: Partially Funded

Total = $4,300,000 (PE: Private Grant & CN: NOAA)

28. Oil City Road MP 8.8-8.9 Permanent Repair

Environmental mitigation / Permanent repairs in response to 2015-2016 emergency repairs.

Funding Status: Planned

Total: $860,000 (FEMA)

29. West Valley Road Safe Routes to School Project

Design and construction of a multi-use trail along West Valley Road to connect more neighborhoods to the 2015 SRTS sidewalk project.

Funding Status: Planned

Total = $916,000

30. Yarr Bridge Replacement

Replacement of a 1955, 25-ft. concrete bridge with structural deficiencies.

Funding Status: Planned

Total = $5,564,000 (FMSIB)

31. Quilcene Complete Streets - Phase 2

Phase 2 project implementing a community driven plan to provide sidewalks, crosswalks, & bicycle lanes to connect school, community center & local businesses.

Funding Status: Planned

Total = $2,023,018 (WSDOT )

32. Olympic Discovery Trail (ODT) - West

PS&E, ROW and construction of a 1.5-mile segment of the ODT from Old Gardiner Road, just south of Contractor's Creek Bridge, to Broders Road.

Funding Status: Planned

Total = $6,151,000

33. Elsie Lopeman Trail Extension

A 0.45 mile trail extension through the County Sewer Treatment plant property. Project is a link in the Tri-Area Active Transportation Network.

Funding Status: Planned

Total = $743,200 (WSDOT)

34. Paradise Bay Road Overlay - Phase 2

2R overlay of Paradise Bay Road from Andy Cooper Road to Teal Lake Road.

Funding Status: Planned

Total = $1,892,800 (CRAB RAP)

35. Countywide Safety Improvements

Systemic safety countermeasures applied to county road network as identified in the Local Road Safety Plan and funded through a biennial WSDOT federal grant program.

Funding Status: Planned

Total = $1,400,000 (FHWA) (10% Local match for PE only)

36. Countywide Bridge Heavy Maintenance Program

Protection of primary bridge components, seismic retrofits, etc. through a biennial WSDOT administered federal grant program.

Funding Status: Planned

Total = $375,000

37. Countywide Various Road Improvements

Various projects countywide involving lighting, signage, intersection control, culvert replacement/ rehabilitation, drainage, surface upgrades, pedestrian and bicycle facilities, or other improvements.

Funding Status: Planned

Total = $237,000

38. Tarboo Creek Culverts Replacement Project

A joint Port Gamble S'Klallam Tribe & Northwest Watershed Institute project to replace two fish barriers on the east fork of Tarboo Creek.

Funding Status: Planned

Total = $992,400 (FHWA AOP)