FY-24 Okaloosa County Roads Completed Project
Okaloosa County’s Roads Division's mission is to ensure a safe transportation system throughout the unincorporated areas of the county.
Pavement Preservation
"Preservation consists of work that is planned and performed to improve or sustain the condition of the transportation facility in a state of good repair. Preservation activities generally do not add capacity or structural value, but do restore the overall condition of the transportation facility." Source: FHWA
Click on pictures for more details

John Riley Barnhill Rd, Baker

Jack Stokes Rd, Baker

Stanley Ln, Baker

Holt Alley, Holt

Yellow Hammer Dr, Crestview

Wheeler Pl, Crestview

Galaxy Dr, Crestview

Opportunity Dr, Crestview

Cavalier Dr, Crestview

Jesse Medley Rd, Crestview

Wolf Track Ridge, Crestview

Yellow Bluff Rd, Crestview

Rainbird Rise Rd, Crestview

Sunburst Dr S, Crestview

Palmetto Ave, Mary Esther

Evergreen Dr, Mary Esther

Austin Ct, Mary Esther

Bridgewater Ct, Mary Esther

Crescent Ct, Mary Esther

Calypso St, Mary Esther

Marimba St, Mary Esther

Cascabellas St, Mary Esther

Managua Way, Mary Esther

South Ave, Fort Walton Beach

Pocahontas Dr, Fort Walton Beach

Jerrells Ave, Fort Walton Beach

Spiller Way, Fort Walton Beach

Manring Dr, Fort Walton Beach

Massachusetts Ave, Fort Walton Beach

Old Carriage Ln, Fort Walton Beach

Saddle Creek Dr, Fort Walton Beach

Pointed Leaf Ln, Fort Walton Beach

W Mariah Way, Fort Walton Beach

Ariel Ct, Fort Walton Beach

Scirocco Loop, Fort Walton Beach

Oddfellow Rd, Fort Walton Beach

Willwall St NE, Fort Walton Beach

Tanner Trail, Shalimar

Bay St, Shalimar

6th Ave, Shalimar

7th Ave, Shalimar

11th St, Shalimar

Arnold Palmer Ct, Shalimar

Ben Hogan Ct, Shalimar

Sam Snead Ct, Shalimar

Jerry Pate Ct, Shalimar

Handolin Ln, Shalimar

Keturah St, Niceville

27th St, Niceville

Sycamore Ave, Niceville

Ward Cove Dr, Niceville

Bluewater Blvd, Niceville

Woodlands Dr, Niceville

Brook Ct, Niceville

Danbury Ct, Niceville

Two Circle Rd, Destin
Dirt to Pave
This is a multi-faceted process. The reason the County has dirt roads is usually because there is zero right of way. Instead, we have prescriptive use and maintenance. By standards, we must have 66’ of right-of-way to build a new road. This right-of-way is used to install the practical and applicable drainage infrastructure to handle the engineer-designed storm level. Once the right-of-way has been acquired, the team of engineers can begin to work on the layout and calculations for stormwater retention or control. Once the plans are completed, signed, and sealed, the project is either constructed in-house using county staff or outsourced to a qualified contractor, depending on the cost of the project and schedule impacts.e.
Click on picture for more details

A L Gillman Rd, Baker
A L Gillman Rd, Baker. Click to expand.
1" Hot Mix Asphalt Stabilization

Bryant Bridge Cut-off, Holt
Bryant Bridge Cut-off, Holt. Click to expand.
1" Hot Mix Asphalt Stabilization

Jack Powell Rd, Crestview
Jack Powell Rd, Crestview. Click to expand.
1" Hot Mix Asphalt Stabilization

E Chestnut Ave, Crestview
E Chestnut Ave, Crestview. Click to expand.
1' overlay on E Chestnut from Rabbit Run to the end approx 1800" to cap chip seal portion

Georgia Ave, Crestview
Georgia Ave, Crestview. Click to expand.
1" Hot Mix Asphalt Stabilization

Hare St, Crestview
Hare St, Crestview. Click to expand.
1" Asphalt Stabilization.

Barnes Rd, Crestview
Barnes Rd, Crestview. Click to expand.
1" Asphalt Stabilization of Barnes Rd from Sandy Lane to end of maintenance.

Walthall Rd, Crestview
Walthall Rd, Crestview. Click to expand.
1" Asphalt Stabilization.

Earl Campbell Rd, Laurel Hill
Earl Campbell Rd, Laurel Hill. Click to expand.
Converted dirt road to paved road

Morning Glory Ln, Laurel Hill
Morning Glory Ln, Laurel Hill. Click to expand.
1" Hot Mix Asphalt Stabilization.

John B Cadenhead Rd, Laurel Hill
John B Cadenhead Rd, Laurel Hill. Click to expand.
1" Hot Mix Asphalt Stabilization

Clary Rd, Laurel Hill
Clary Rd, Laurel Hill. Click to expand.
1" Asphalt Stabilization.

Plympton Rd E, Laurel Hill
Plympton Rd E, Laurel Hill. Click to expand.
1" Asphalt Stabilization of Plympton Rd E from Hwy 85 N to end.

Jack Rd, Laurel Hill
Jack Rd, Laurel Hill. Click to expand.
1" Asphalt Stabilization.

Luke Ln, Laurel Hill
Luke Ln, Laurel Hill. Click to expand.
1" Asphalt Stabilization.
Stormwater Completed Projects
Click on pictures to see multiple views of each stormwater site.

Poplar Head Church Rd, Baker

Lenwood Jackson Rd, Baker

Overview Dr, Crestview

5408 Old Bethel Rd, Crestview

Crestview Welcome + Adventure Center

Foy Shaw Pkwy, Crestview

Earl Campbell Rd, Laurel Hill

1613 Oakmont Cir, Niceville

4218 Shadow Ln, Niceville

13th St, Niceville

1756 Thomas St, Niceville

10th Ave, Shalimar

Schneider Dr & Patriot Ct, Fort Walton Beach

Okaloosa County Fairgrounds, Fort Walton Beach

Al Hammett Rd, Mary Esther
Bridges

Live Oak Church Rd Bridge, Crestview