2024 Comprehensive Transportation Plan Projects
The City has identified projects that will address traffic congestion, intersection delays, or lack of infrastructure throughout the city. The below map shows the locations of these projects.
Click on a location icon or a project name to learn more about each project. You can click on a concept drawing to view a larger version. To exit a project description and go back to the whole list of projects, click the X in the white circle at the bottom of the project description.
City contact information is at the bottom of the page.
Translations
如需翻译,请发送电子邮件至 CTP@auburnwa.gov。 翻訳については、CTP@auburnwa.gov まで電子メールでお問い合わせください。 번역을 원하시면 CTP@auburnwa.gov로 이메일을 보내주세요. ਅਨੁਵਾਦ ਲਈ, CTP@auburnwa.gov 'ਤੇ ਈਮੇਲ ਕਰੋ। Para una traducción, envíe un correo electrónico a CTP@auburnwa.gov. Щоб отримати переклад, надішліть електронний лист на CTP@auburnwa.gov. Для перевода отправьте электронное письмо по адресу CTP@auburnwa.gov. For a translation, email CTP@auburnwa.gov.

COMP-1: Auburn Way N & 45th St NE Intersection Improvements
Intersection delays will be reduced through the replacement of the stop control with construction of a new traffic signal.

COMP-2: Auburn Way N & 42nd St NE Intersection Improvements
Intersection delays will be reduced through the restriction of left turns from 42nd St NE to Auburn Way N during PM peak hours with signage installed on a new raised median.

COMP-3: I St Improvements (37th St NE - 45th St NE)
The I St NE Corridor provides access to several neighborhoods and commercial properties. To improve multi-modal safety, and meet city roadway standards, bicycle and pedestrian improvements are proposed between 37th St NE and 45th St NE.

COMP-4: I St NE & 37th St NE Intersection Improvements
Intersection delays will be reduced through the construction of a single-lane roundabout.

COMP-5: I St NE & 30th St NE Intersection Improvements
Intersection delays will be reduced through the construction of a single-lane roundabout.

COMP-6: SE 304th St & 112th Ave SE Intersection Improvements
Intersection delays will be reduced through the construction of a new two-stage left turn lane on SE 304th St that will assist motorists turning from 112th Ave SE. A pedestrian refuge island and flashing beacons will be provided to enhance pedestrian crossing safety.

COMP-7: SE 304th St & 118th Ave SE Intersection Improvements
Intersection delays will be reduced through the construction of a raised median on SE 304th St that will restrict left turns from 118th Ave.

COMP-8: SE 304th St & 116th Ave SE Intersection Improvements
Intersection delays will be reduced through the construction of a single-lane roundabout.

COMP-9: Lea Hill Corridor Improvements
This project will reduce intersection delays, improve vehicle and active transportation safety, and support mode shift through the construction of the following improvements that would likely be implemented as two separate phased projects:

Comp-10: 116th Ave SE & SE 312th St Improvements
This project will reduce intersection delays, address bike and pedestrian LTS deficiencies, and provide overall safety improvements on Lea Hill Road/SE 312th Street from a new roundabout to be constructed with a separate project at the intersection of 112th Ave SE to the intersection of 124th Ave SE. Improvements include a new single lane roundabout at the intersection of 116th Ave SE, a bike lane along the north side of Lea Hill Road/SE 312th Street between 112th Ave SE and 116th Ave SE, and completing gaps in sidewalks and bike lanes on both sides of Lea Hill Road/SE 312th Street between 116th Ave SE and 124th Ave SE

COMP-11: 116th Ave SE & SE 320th St Intersection Improvements
This project will improve vehicle and active transportation safety at the intersection with the construction of a single lane roundabout. This project may be expanded to complete gaps in sidewalks and bike lanes on SE 320th Street.

COMP-12: Pike St NE & 8th St NE Access Management
Intersection delays will be reduced by restricting left turns from both northbound and southbound Pike St NE on to 8th St NE.

COMP-13: 8th St NE Improvements Project (Auburn Way N - Harvey Rd/M St NE)
Residents from the neighborhoods along 8th Street NE currently must walk or ride along narrow shoulders to get to shopping, social services, recreation, and transit along Auburn Way North and M Street/Harvey Rd. This route is part of the City's designated bike route network (as shown in Map 2 - Bike Network) and is a critical connection to Downtown Auburn and regional transit and bike facilities. This project will improve the roadway to provide comfortable walking and biking facilities that meet or exceed the City's active transportation level of service standards. The project concept currently includes a center turn lane but whether or not the lane is included in the final project design will depend on detailed design considerations, including right of way needs.

COMP-14: 10th St NE Improvements (A St NW - Auburn Way N)
This project will provide bicycle facilities that meet or exceed City LTS Standards and improve vehicle and pedestrian safety measures on 10th Street NE between A Street NW and Auburn Way North. Improvements include addition of bike lanes, a road-diet to convert two lanes in each direction with a center turn lane, removal of stop-control at the intersection of A Street NE, and installation of an enhanced pedestrian crossing. The project provides active transportation facilities that connect housing and commercial areas to frequent transit on Auburn Way North.

COMP-15: 15th St NW & M St NW Access Management
Intersection delays will be reduced by restricting left turns from southbound M St NW to eastbound 15th St NW during peak travel demand periods.

COMP-16: S 316th St & 56th Ave S Intersection Improvements
Intersection delays will be reduced through the construction of a single-lane roundabout.

COMP-17: S 316th St & 51st Ave S Intersection Improvements
Intersection delays will be reduced through the replacement of the stop controls with the construction of a new traffic signal. This intersection is outside City limits in King County. Coordination with King County will be required to fund and implement this project.

COMP-18: S 321st St & 44th Ave S/46th Pl S Intersection Improvements
Intersection delays will be reduced through the construction of a single-lane roundabout. This intersection is outside City limits in King County. Coordination with King County will be required to fund and implement this project. Temporary mitigation measures to address existing LOS deficiency may require a traffic signal or other improvements until permanent project can be funded. Additional analysis is needed to determine if existing and/or future capacity needs can be met by improving the right-of-way east of 46th Place with roadway facilities instead of, or in addition to this roundabout.

COMP-19: A St NW & 3rd St NW Improvements
This project will reduce intersection delays and improve overall vehicle, pedestrian, and bicycle operations through this intersection be re-constructing the south leg of the intersection to be re-aligned such that the split phase operations of the signal can be removed. Modeling indicates that despite this project, the southbound right turn lane queue would have a queue length that exceeds LOS standards. Therefore, additional refinement of this project would be required with, or prior to, implementation.

COMP-20: C St NW & 3rd St NW Intersection Improvements
Intersection delays will be reduced through the addition of a dedicated eastbound left turn lane on 3rd Street NW and modifying the signal operations to allow for protected/permissive left-turns on all approaches.

COMP-21: M St SE By-Pass Rd (M St SE By-Pass Rd & SE Auburn-Black Diamond Rd)
This project will provide a new roadway connection between Auburn Black Diamond Road and M Street SE. The new connection will provide pedestrian, bicycle, and vehicle connectivity that allows by-pass of the at-grade railroad crossing at Black Diamond Road/R Street SE to the grade separated crossing at M Street SE. There are two alternatives for this project that will be considered further with preliminary project design.

COMP-22: Auburn Way S, M St SE, 17th St SE Intersection Improvements
Intersection delays will be reduced with several improvements including:

COMP-23: M St SE & 12th St SE Intersection Improvements
This project will reduce intersection delays with a new traffic signal. The project will also construct a separated trail along the east side of M Street SE between 12th Street SE and 8th Street SE to address active transportation level of service requirements.

COMP-24: M St SE & 29th St SE Intersection Improvements
This project will reduce vehicle delays, improve operations and safety, and provide improved access for bikes and pedestrians through the intersection through construction of a single lane roundabout to replace the current all-way stop control.

COMP-25: A St SE Corridor Improvements (37th St SE - White River Bridge)
This project will reduce intersection delays at the intersections of C St SW & Ellingson Rd/41st St SE, A St SE & Ellingson Rd/41st St SE, and at SE & 44th St SE (private road). The project will provide active transportation facilities that support mode shift and improved vehicle and active transportation safety. The improvements would likely be implemented with multiple projects implemented over time as funding is available.

COMP-26: A St SE & 12th St SE Intersection Improvement
Intersection delays will be reduced through the replacement of the stop control with construction of a new traffic signal.

COMP-27: A St SE & 21st St SE Intersection Improvements
Intersection delays will be reduced through the replacement of the stop control with construction of a new traffic signal. Improvements may also include widening for a northbound u-turn to support access management along the corridor.

COMP-28: Lakeland Hills Way SE & Oravetz Rd SE Corridor and Intersection Improvements
Intersection delays will be reduced through the replacement of the stop control with construction of a new traffic signal.
Contact Information
If you have any questions about a project, or would like to share any comments or concerns, please email CTP@auburnwa.gov or call Public Works Engineering at 253-931-3010.
Return to the 2024-2044 Comprehensive Transportation Plan Homepage
To go to the 2024-2044 Comprehensive Transportation Plan homepage and learn more about the Plan update process and view a complete draft of the Plan, click the below button.