Linder Overpass and Roadway Project - Public Outreach #2
October 19 - November 2, 2023
Welcome
Thank you for visiting the Linder Road, Overland Road to Franklin Road Project Open House. Here you will find information about the upcoming improvements. At the end, you will be able to provide feedback on the project.

Please continue scrolling down to browse through the full content of the website or toggle to different sections using the navigation bar above.
If you need printed materials mailed to you or need to make other arrangements to answer your questions, please call 208-387-6100 | TTY 1-800-377-3529 and we will be happy to help you.
While your comments are always welcome, they can best be used if received by November 2, 2023.
What we heard

What has changed since March 2023?
- Project limits were extended south, through the Overland Road intersection, to facilitate a continuous multi-use pathway
- Added a longer concrete pedestrian railing and wall along the multi-use path to increase safety along the approaches to the overpass
- Widen buffer between MUP and road from 4-feet to 5-feet
- Increased multi-use pathway width on overpass and approaches
- The City of Meridan plans to landscape the buffer space between the multi-use pathway and the street, as well as center medians
- Construction is now anticipated for 2026/2027
Project Description
- Construct a new 4-lane overpass spanning Interstate 84.
- Widen Linder Road, between Franklin Road and new overpass to two lanes in each direction with a center turn lane.
- Extend Linder Road, from Overland Road to new overpass.
- Add multi-use pathways for pedestrians and bicyclists.
- Include enhanced pedestrian crossings on Linder Road near Waltman Street and Greenhead Drive.
- Construct landscaped center medians for speed mitigation.
- Replace bridges over Tenmile Creek and the Kennedy Lateral.
- Realign west section of Verbena Drive.
Rendering Description: Project overview looking south from the east
Interstate I-84 Overpass
The proposed overpass will feature:
- Two travel lanes in each direction
- A multi-use pathway separated with a concrete pedestrian wall
Rendering Description: Looking north from the west at new overpass over I-84, Camping World to the east.
Pedestrian Hybrid Beacon at Waltman Street
Add a pedestrian hybrid beacon on Linder Road at Waltman Street and Gander Drive to improve crossing safety for pedestrians and bicyclists.
Rendering Description: Linder Road looking north from Waltman Street to Gander Drive
Overland Road and Linder Road Intersection
Extend Linder Road from Overland Road to the north, to connect to the proposed overpass.
Rendering Description: Looking north-east from the Overland Road and Linder Road intersection.
Right in, Right out
- Add a curb median on Linder Road near Franklin Road for safety.
- Barrett Drive and nearby business driveways will have right in, right out access only.
- U-turns allowed at Franklin Road.
Rendering Description: Looking north towards Franklin Road.
Multi-Use Pathways
- Multi-use pathways are two-way facilities meant to accommodate both pedestrians and bicyclists of all ages and abilities.
- They provide more space between motorists and those walking and biking, which increases safety.
- They are often used on roads with higher speeds and traffic volumes.
Rendering Description: Multi-use pathway with pavement markings.
Overpass Section
- 4-lanes
- Barrier separating travel lanes from pathway
Linder Road - center turn lane
- 5-lanes
- Center turn lane
- Multi-use pathway
Linder Road - with raised median
- 4-lanes
- Raised median
- Multi-use pathway
Other Projects Planned in the Area
Over the next five years, ACHD has many projects planned in this area. To learn more about the projects ACHD has planned, click the button below to take you to ACHD's interactive online map for the Integrated Five-Year Work Plan (IFYWP) or you can view the interactive map below.
ACHD Integrated Five-Year Work Plan
Project Timeline
2022
Design Started
March 2023
Public Input Opportunity
Summer 2023
Refine Design
We are here Fall 2023
Second opportunity for public feedback
2024/2025
Purchase property necessary for the project
2026/2027
Construction
Public Input Survey #2
Thank you for taking the time to view the project information for the Linder Road Project. Let us know what you think below by filling out the survey!
While your comments are always welcome, they can be best used if received by November 2, 2023.
After the comment period closes, ACHD will review and address comments received from the public.
Survey | ACHD Engage
Contact Us
Brian McCarthy, ACHD Project Management Supervisor
Phone: 208-387-6223 I TTY: 1-800-377-3529