Rocky Mountain National Park Proposes to Construct New Housing Destroyed by the East Troublesome Fire

Photograph of project area.

Introduction

Rocky Mountain National Park (park) encompasses approximately 265,761 acres of the scenic southern Rocky Mountains in Larimer, Grand, and Boulder Counties, Colorado. The park supports a diversity of ecosystems ranging in elevation from 7,600 to 14,259 feet, including montane, subalpine, and alpine communities. Park visitors can drive the Trail Ridge Road, a designated America’s Byway topping out at 12,183 feet, or access over 355 miles of trails in the park for hiking, backpacking, and horseback riding. Mountain climbers, anglers, cross-country skiers, snowshoers, wildlife watchers, and photographers also enjoy the park.

Click the + button to zoom in on the map and the – button to zoom out (lower right of screen). Use the scroll bar on the right or the down arrow on your keyboard to move to the next page of the story map.

Rocky Mountain National Park Map
Rocky Mountain National Park Map
Powered by Esri

Project Background

On October 21, 2020, the East Troublesome Fire made an 18-mile and over 100,000-acre run in Grand County, Colorado. In the Colorado River District (west unit), the park lost numerous structures, including 18 historic buildings at the former Green Mountain-Onahu seasonal housing area, all utilities, and three recreational vehicle sites.

The National Park Service (NPS) generally relies on the private sector to provide housing for NPS employees. However, if housing of reasonable price and quality is not available in the private sector, NPS policy is to provide only the number of housing units needed to support the NPS mission. The NPS charges rent to employees for any housing that it provides. Housing needs assessments conducted for the west side of the park have established that seasonal housing units in the park are necessary to support the NPS mission.

The goal of the Construct New Housing Destroyed by East Troublesome Fire in Rocky Mountain National Park Project (proposed project) is to provide adequate housing to meet the seasonal staffing requirements for the park’s Colorado River District. A combination of two dormitories, ten residential units, three recreational vehicle sites, and a residential support facility (with laundry, showers, and a kitchen) would meet immediate housing needs and replace housing and recreational vehicle sites lost in the fire.

Before and after fire photographs of Onahu Ranch Lodge in the Green Mountain-Onahu seasonal housing area.
Before and after fire photographs of Onahu Ranch Lodge in the Green Mountain-Onahu seasonal housing area.

Project Location

The proposed project would take place in the park’s west side in the Colorado River District. The new housing area would be located on approximately 10 acres of undeveloped land, directly west of the existing Colorado River District housing area, and west of the Kawuneeche Visitor Center, and would be accessed from County Road 491. A private neighborhood is west of the park boundary in this area. Several existing park buildings are immediately to the south.

In addition to the construction of the new housing area, a damaged well and water infrastructure in the existing Colorado River District housing area would be replaced.

The NPS would also remove and abandon utilities from the former Green Mountain-Onahu seasonal housing area. The former Green Mountain-Onahu seasonal housing area is accessed off Trail Ridge Road (US Highway 34), approximately 2.8 miles north of the Kawuneeche Visitor Center.

Project Location Map

Proposed Project

The proposed project would address the loss of housing in the former Green Mountain-Onahu seasonal housing area. It would help ensure adequate seasonal housing in the Colorado River District by providing 22 beds for seasonal staff, connecting to existing utilities to support extended season occupancy, and providing three recreational vehicle parking sites. The proposed project would also provide a residential support facility (with laundry, showers, and a kitchen) for seasonal staff. These rangers provide visitor services and carry out park operations and include park guides, fee and campground staff, trail crew members, buildings and utilities staff, administrative assistants, and custodians.

Photographs include example front elevation of proposed two-bedroom unit and example one-bedroom unit.

Project Elements

Proposed Housing

  • Six one-bedroom units, each approximately 678 square feet
  • Four two-bedroom units, each approximately 1,120 square feet
  • Two four-bedroom dormitories, each approximately 2,111 square feet
  • Residential support facility, approximately 1,498 square feet, with laundry, showers, and a kitchen

The new housing area would result in approximately 2.4 acres of permanent surface disturbance and approximately 7.8 acres of temporary surface disturbance. Areas of temporary surface disturbance would be reseeded.

Infrastructure and Utilities

The NPS would construct infrastructure for the new housing area such as a paved loop road and water, sewer, telecommunications, and electrical systems. The new water system would replace damaged utility infrastructure in the existing Colorado River District housing area.

At the former Green Mountain-Onahu seasonal housing area, the NPS would demolish and/or abandon fire-damaged utilities, including distribution boxes, septic fields, septic tanks, and an aboveground water storage tank. Debris and burned structures will be removed as part of a separate project.

Simplified schematic design.

Project Timeline

Fall 2021:

Initiate planning and design

Fall 2021–Summer 2022:

Survey existing natural and cultural resources in the project area

Spring 2022:

Complete initial schematic design

Summer 2022:

Engage the public, stakeholders, and tribes for preliminary feedback on the proposed project

Summer–Fall 2022:

Incorporate preliminary feedback, continue environmental analysis, and refine design

Fall 2022:

Release draft environmental analysis and engage the public, stakeholders, and tribes for feedback

Fall 2022–Winter 2023:

Incorporate public feedback and finalize the analysis and design

Spring–Summer 2023:

Anticipated start of construction

Photo of Mountain lupine.


Resource Assessments

The NPS is conducting natural and cultural resources surveys in the project area, including in the new housing area and in the former Green Mountain-Onahu seasonal housing area. Preliminary results are shared below.

Click the + button to zoom in on the map and the – button to zoom out (lower right of screen). Use the scroll bar on the right or the down arrow on your keyboard to move to the next page of the story map.

Water Resources

The NPS completed a preliminary field survey to assess potential surface water resources in and near the project area. The NPS identified the following surface water resources during this survey:

  • 1,744 linear feet of riverine habitat (Harbison Ditch)
  • 1.39 acres of freshwater ponds
  • 1.81 acres of palustrine emergent wetlands
  • 0.27 acre of palustrine forested wetlands
Photograph of suspected wetlands.

The proposed project could affect the surface water resources identified in the preliminary field survey. The NPS is currently completing a formal aquatic resources delineation of the project area and will assess impacts on surface water resources in accordance with NPS policy and the Clean Water Act.

Photograph of suspected wetlands.

The NPS has designed the proposed project around the preliminary survey results, and the proposed project is expected to avoid impacts on the identified surface water resources (which are north and south of the new housing area). In addition, stormwater management to prevent stormwater from reaching surface water resources would include the installation of appropriate surface water drainage, culverts, and bioretention cells. The bioretention cells would be landscaped depressions designed to capture and infiltrate stormwater runoff from impervious surfaces.

Water Resources Map

Vegetation and Tree Cover

The project area is within a transitional zone of montane and subalpine ecosystems, typically including large meadow valleys, adjacent hilly slopes, and a diversity of plant and animal species. A uniform-aged lodgepole pine (Pinus contorta) forest with dense tree stands spreads throughout the landscape. Invasive plants such as cheatgrass (Bromus tectorum) often dominate the natural understory. The new housing area would be located on land where the majority of mature lodgepole pine and spruce were badly burned or have fallen because of the East Troublesome Fire. Lodgepole pines of various age classes remain in isolated clusters.

The NPS would need to clear dead, fallen, and standing dead trees from the site to construct the proposed project. In addition, the NPS anticipates that some live tree removal could be necessary for the proposed project.

The largest diameter trees would be prioritized for protection, and surviving trees would be saved where possible.

Typical vegetation setting for the new housing area.

Click on the layer list to the left to see the types of ungulate habitat in and around the project area. Check a box to see the location of a particular habitat or migration pattern. Use the scroll bar to advance to the next page of the story map.

Elk, Moose, and Deer

Photograph of elk.

The NPS conducted a literature review for Rocky Mountain elk (Cervus canadensis nelsoni), Shiras moose (Alces alces shirasi), and mule deer (Odocoileus hemionus) to understand ungulate use in and around the project area and how it could be affected by the proposed project.

The literature review found that the project area overlaps several ungulate seasonal ranges and provides habitat for elk, moose, and mule deer. Forage for elk, moose, and mule deer is present in the project area, but higher quality browse is available in the nearby Kawuneeche Valley meadows.

Photograph of moose.

The proposed project could result in impacts on elk, moose, and mule deer in the area. Permanent impacts could include removal of vegetation and installation of housing and other project elements, disturbance and noise from residents and pets, and the possible fragmentation of habitat. These impacts could cause animals to move to other habitats or change movement patterns. Temporary impacts could include noise and human activity during construction and the potential use of construction fencing, which could entangle or injure ungulates or prevent animal movement. Temporary impacts would only occur during construction. Although permanent and temporary impacts on elk, moose, and mule deer are expected from the proposed project, the habitat in the project area is of lower quality when compared to surrounding areas.

Photograph of mule deer.

The NPS has designed the proposed project to cluster the housing in one area, which would likely reduce the overall impact on elk, moose, and mule deer because it would allow for larger, intact habitats to exist outside of the new housing area. In addition, the NPS would develop protective measures, as appropriate, such as the use of native vegetation to reseed areas and the use of wildlife-safe fencing practices during construction.

Take a look at the literature review report here:    https://parkplanning.nps.gov/reconstructCRDhousing-scoping 

Elk, Moose, and Deer Map

Special Status Wildlife Species

No special status wildlife species have been identified in the project area. However, migratory birds such as golden eagle (Aquila chrysaetos) and red-tailed hawk (Buteo jamaicensis) may be present in and near the project area. In addition, razorback sucker (Xyrauchen texanus), humpback chub (Gila cypha), Colorado pikeminnow (Ptychocheilus lucius), and bonytail (Gila elegans) are special status fish species present in the Colorado River downstream of the park.

Construction of the proposed project could affect migratory birds through tree removal (which could destroy nests) and the presence of human activity and noise. Special status fish species could be negatively affected if the proposed project affects downstream water quality or quantity. The NPS would implement measures designed to protect wildlife during all phases of construction.

Photograph of red-tailed hawk.

Special Status Plant Species

The NPS completed a preliminary special status plant species field survey in the fall of 2021 to identify special status species in the project area. No special status plant species were observed during the 2021 preliminary survey. A formal survey for special status plant species will be completed in spring and fall 2022.

Although no special status plant species were initially observed during the 2021 preliminary survey, there is still the potential for them to be present within the project area, especially because vegetation is continuing to regenerate after the East Troublesome Fire. Impacts on special status plant species are unknown at this time, but an additional analysis will occur upon completion of the formal survey.

If special status plant species are identified in the project area during the formal survey, preconstruction planning and project design configuration changes could be used to avoid specific plants or mitigate impacts on plants.

Photos of common wildflowers: one-sided penstemon, American bistort, and western yellow paintbrush.

Historic Resources

The NPS is conducting cultural resource surveys in the project area, including the existing Colorado River District housing area, the new proposed housing area, and the former Green Mountain - Onahu Ranch housing area.

At the existing Colorado River District housing area, the survey identified three historic buildings—two ranch houses and one maintenance building—associated with the Mission 66 development period of the park. However, these surveys indicate that there is no historic district or cultural landscape in this area.

The survey at the proposed housing area is in process.

First homesteaded in the 1880s, Green Mountain Ranch and the adjacent Onahu Ranch were repurposed as resort ranches ca. 1938 and 1945, respectively. Guest operations at these resort ranches terminated in the early 1970s, and the NPS converted many of the rustic-style wood-frame and log buildings to employee housing. However, of the approximately 18 historic guest cabins and supporting buildings such as a lodge and barn, only 2 survived the East Troublesome Fire: the Nimbus Cottage at the Green Mountain Ranch and the Ba Haa Thoson Cottage at the Onahu Ranch, both built in 1939.

Impacts of the proposed project on historic resources are unknown at this time. Consultation with the Colorado State Historic Preservation Office about historic buildings and landscapes is ongoing.

Photographs of Ba Haa Thoson Cottage and Nimbus Cottage.

Archeological Resources

Archeological surveys within the new housing area will be completed in the summer of 2022.

People have been inhabiting the Kawuneeche Valley and the area surrounding the park’s Grand Lake Entrance for thousands of years, beginning more than 11,000 years ago during the last ice age. Archeological studies in the park have identified cultural material associated with Native Americans (including present-day tribes such as the Arapaho, the Shoshone, and the Ute) as well as with European Americans. Near the Grand Lake Entrance, the Harbison family established Harbison Ranch in the late 19th century, and during the mid-20th century, the NPS purchased the land on which the ranch was located. Although the NPS ultimately relocated or demolished many of the ranch buildings, material associated with this history is still evident. Numerous trails related to the early and modern history of the park crisscross the area and today are used both by the NPS as administrative trails and by the NPS and private entities as recreational trails.

Impacts on archeological resources in the project area are unknown at this time because archeological surveys and analyses are still ongoing. However, the NPS is working with tribal partners and the Colorado State Historic Preservation Office at History Colorado to better understand the importance of the resources.

Photo of an early twentieth century archaeological resource in the project area.

Visual Resources

The NPS conducted an assessment to evaluate and analyze the visual impacts of the proposed project. Potential impacts on visual resources, viewsheds, and the experience of viewers were analyzed from the following three vantage points:

  • Vantage Point 1: Harbison Meadows Picnic Area (near Trail Ridge Road)
  • Vantage Point 2: Grand Lake Lodge (a historic property outside the park boundary)
  • Vantage Point 3: South Columbine Lake Neighborhood (outside the park boundary, west of the new housing area)

The visual assessment included a line-of-sight analysis, which evaluated the visibility of the proposed project’s rooflines from the three vantage points.

Click on the vantage points to see maps showing this analysis. Once the map opens, click on the map to enlarge it.

The visual assessment determined that the degree of impact from all three vantage points would be neutral and the overall character of the visual resource would be protected. The housing for the proposed project has been designed to be generally consistent with the visual character of the housing in the existing Colorado River District housing area in scale, massing, color, orientation, and site layout.

Vantage Point Map

The photos below show the view of the new housing area from each of the three vantage points.

Photo of vantage point 1.

Vantage Point 1: Harbison Meadows Picnic Area, looking south

Photo of vantage point 2.

Vantage Point 2: Grand Lake Lodge, looking northwest

Photo of vantage point 2.

Vantage Point 3: South Columbine Lake Neighborhood, looking northeast

US Highway 34 and County Road 491

County Road 491 provides access to the new housing area and the existing Colorado River District housing area. It also connects lodges, homes, other accommodations, and businesses in Sun Valley to US Highway 34 and the Kawuneeche Visitor Center. US Highway 34 is the main entrance for the west side of the park. It provides access into the park to the north and into Grand Lake to the south.

The NPS conducted a traffic study to assess the impacts of the proposed project on existing traffic and to assist with project planning. Three intersections were evaluated: the intersection of County Road 491 and US Highway 34 and the two intersections of County Road 491 and the existing Colorado River District housing area loop road.

The traffic study concluded that development of the proposed project would not create noticeable, long-term traffic impacts. The increase in traffic from the new housing area would not affect traffic conditions at any of the analyzed intersections.

During construction, there would be temporary traffic delays and lane closures on County Road 491 for construction work. The NPS would minimize, to the extent possible, traffic delays and closures. The traffic study recommends several long-term safety management strategies, including 1) limited tree removal to improve sight distances for the intersections of County Road 491 and the existing Colorado River District housing area and 2) the installation of crosswalks with warning signs and crosswalk striping between the new housing area and the existing Colorado River District housing area.

Intersections Map

Stock Trail and Snowmobile Trail

An existing stock trail parallels the west side of the new housing area running from north to south, and an existing snowmobile trail runs along the eastern and southern borders of the new housing area. The NPS would slightly realign the stock trail to the west to accommodate the new housing area and would adjust the grade of the snowmobile trail at the entrance to the new housing area to accommodate a new access road from County Road 491.

The realignment of the stock trail and grade adjustment for the snowmobile trail would require temporary trail closures during construction. It is unknown how long stock trail closures would be. Snowmobile trail closures are not expected to affect winter users because project construction would occur during the warmer months.

Photo looking east-southeast from County Road 491 at the stock trail.

Get Involved

What is the National Environmental Policy Act?

The National Environmental Policy Act (NEPA) requires federal agencies to fully consider the impacts of proposals that would affect the human environment prior to deciding to take an action. NEPA also requires federal agencies to involve the interested and affected public in decision making. Visit  https://ceq.doe.gov/  to learn more about NEPA.

Photo of National Park Service NEPA Handbook

Give Feedback

It is important that we hear from you during our preliminary planning phase!

Please comment on the proposed project and provide your valued input on this question:

  • What issues or concerns should park staff consider as the project planning proceeds?

To provide comments on the question above, please visit the project website:  https://parkplanning.nps.gov/reconstructCRDhousing . Look for "open for comment" on the left side of the screen.

Attend a Virtual Meeting

The NPS held a virtual public meeting on the following date:

  • Tuesday, July 12, 2022, from 6:00 to 7:00 p.m.

Next Steps

The NPS encourages public participation throughout the planning process. There will be two opportunities to comment formally on the proposed project: one during the preliminary planning phase (July 2022) and another following additional analysis (September 2022). Comments received during the preliminary planning phase will help define the issues and concerns to be addressed during the NEPA process, as well as shape potential design considerations and mitigation that would reduce impacts and alleviate concerns.

National Park Service Logo


Vantage Point 1: Harbison Meadows Picnic Area, looking south

Vantage Point 2: Grand Lake Lodge, looking northwest

Vantage Point 3: South Columbine Lake Neighborhood, looking northeast