Road Construction

CIP Projects & Current Detours


DETOURS OF CURRENT PROJECTS

Powered by Esri

Detours for Construction Projects


OVERVIEW OF COMPLETED PROJECTS

Jeffers Road Reconstruction

Jeffers Road Reconstruction. Click to expand.

Green Park Drive to County Line Road

COMPLETED - Eddy Lane Reconstruction

COMPLETED - Eddy Lane Reconstruction. Click to expand.

N Hastings Way to Starr Ave

COMPLETED - S Dewey Street

COMPLETED - S Dewey Street. Click to expand.

Washington St to North of Marston Ave

COMPLETED - Marston Avenue

COMPLETED - Marston Avenue. Click to expand.

S Farwell St to S Dewey St

COMPLETED - Maple Street

COMPLETED - Maple Street. Click to expand.

Sixth St to Third St

COMPLETED - Second Street

COMPLETED - Second Street. Click to expand.

Platt St to Vine St

COMPLETED

COMPLETED. Click to expand.

Mercury Avenue - Hwy 312 to Marquette St

COMPLETED - Omaha Street

COMPLETED - Omaha Street. Click to expand.

McDonough St to Starr Ave

COMPLETED - City Wide Milling & Asphalt Paving

COMPLETED - City Wide Milling & Asphalt Paving. Click to expand.

E Hamilton Avenue - London Rd to Mall Dr

COMPLETED - Folsom Street

COMPLETED - Folsom Street. Click to expand.

Truax Blvd to Third St

COMPLETED - Bellevue Avenue & Holm Avenue

COMPLETED - Bellevue Avenue & Holm Avenue. Click to expand.

Bellevue Ave: Spring St to Bergen Ave Holm Ave: Ball St to E Madison St

COMPLETED - Barron Street

COMPLETED - Barron Street. Click to expand.

Sheridan Road to Addison Avenue

COMPLETED Eau Claire River Trail

COMPLETED Eau Claire River Trail. Click to expand.

Barstow St to Farwell St, South side of Eau Claire River

COMPLETED City Wide Milling & Asphalt Paving

COMPLETED City Wide Milling & Asphalt Paving. Click to expand.

Riverview Drive - Marquette St to Hwy 312

COMPLETED City Wide Milling and Asphalt Paving

COMPLETED City Wide Milling and Asphalt Paving. Click to expand.

Seymour Road - Starr Avenue to East 250 feet

Completed - City Wide Milling and Asphalt Paving

Completed - City Wide Milling and Asphalt Paving. Click to expand.

SW Dog Park - Driveway off of Ferry St

Completed - Melby Street Reconstuction

Completed - Melby Street Reconstuction. Click to expand.

Anderson Dr to Hastings Way

Completed - Chippewa River Trail

Completed - Chippewa River Trail. Click to expand.

1st Ave to Grand Ave Plaza, West side of Chippewa River

Jeffers Road Reconstruction

Green Park Drive to County Line Road

Phase One: COMPLETED

Proposed Work: Construction will consist of; removing the existing asphalt surface, sanitary sewer installation, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, concrete sidewalks, concrete multi-use trail, restoration of disturbed areas with sod and or seed, and pavement markings.

This project will be supervised by the City Engineering Department and CBS Squared, Inc. City inspectors will be on site during construction , and will be able to help answer any questions you may have regarding the project. For More Project and Contact Information - click "More Info" button below

COMPLETED - Eddy Lane Reconstruction

N Hastings Way to Starr Ave

Water Main & Services, Sanitary Sewer & Services, Storm Sewer, Grade, Gravel, Curb & Gutter, Sidewalk, Sidewalk Repair, Driveway Approaches, Bituminous Pavement, and Boulevard Restoration

Project Engineer: Russell Johnson

City Inspector: Ben Nauertz

Contact Info: 715-839-4934

COMPLETED - S Dewey Street

Washington St to North of Marston Ave

Proposed Work: Removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, new sidewalk (as required), sod installation, and seeding.

Project Engineer: Tim Pluth

City Inspector: Ben Nauertz

Contact Info: 715-839-4934

COMPLETED - Marston Avenue

S Farwell St to S Dewey St

Proposed Work: Removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, new sidewalk (as required), sod installation, and seeding.

Project Engineer: Tim Pluth

City Inspector: Ben Nauertz Contact Info: 715-839-4934

COMPLETED - Maple Street

Sixth St to Third St

Proposed Work: Removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, new sidewalk (as required), sod installation, and seeding.

City Engineer: Trevor Wittwer City Inspector: Devin Moore Contact Info: 715-839-4934

COMPLETED - Second Street

Platt St to Vine St

Proposed Work: Construction will consist of; removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, sidewalk replacement, restoration

City Engineer: Trevor Wittwer City Inspector: Devin Moore Contact Info: 715-839-4934

COMPLETED

Mercury Avenue - Hwy 312 to Marquette St

Proposed Work: Milling of Bituminous Pavement, Spot repair of; curb and gutter, driveway approaches, and sidewalks, Bituminous pavement, Pavement marking, and Restoration.

City Engineer: Tim Pluth City Inspector: Cody Thiede Contact Info: 715-839-4934

COMPLETED - Omaha Street

McDonough St to Starr Ave

Proposed Work: Removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, new sidewalk (as required), sod installation, and seeding.

Project Engineer: Trevor Wittwer

City Inspector: Cody Thiede

Contact Info: 715-839-4934

COMPLETED - City Wide Milling & Asphalt Paving

E Hamilton Avenue - London Rd to Mall Dr

Proposed Work: Construction of E. Hamilton Avenue will consist of; repairing concrete curb and gutter, repairing concrete sidewalk, repairing concrete driveway approaches, installation of pedestrian ramps, milling existing asphalt surface, paving new asphalt surface, boulevard restoration, and pavement marking.

City Engineer: Tim Pluth City Inspector: Cody Thiede Contact Info: 715-839-4934

COMPLETED - Folsom Street

Truax Blvd to Third St

Proposed Work: Construction will consist of; removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, sidewalk replacement, restoration

City Engineer: Trevor Wittwer City Inspector: Devin Moore Contact Info: 715-839-4934

COMPLETED - Bellevue Avenue & Holm Avenue

Bellevue Ave: Spring St to Bergen Ave Holm Ave: Ball St to E Madison St

Proposed Work: Construction will consist of removing the existing asphalt surface, removing curb and gutter, removing concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, grading and graveling, retaining wall replacement, new curb and gutter, sidewalk replacement, new concrete driveway approaches, new asphalt surface, and restoration of disturbed areas.

Project Engineer: Russell Johnson Project Inspector: Cody Thiede Contact Information: 715-839-4934

COMPLETED - Barron Street

Sheridan Road to Addison Avenue

Proposed Work: Construction will consist of removing the existing asphalt surface, removing curb and gutter, removing concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, grading and graveling, retaining wall replacement, new curb and gutter, sidewalk replacement, new concrete driveway approaches, new asphalt surface, and restoration of disturbed areas.

City Engineer: Christien Huppert City Inspector: Ben Nauertz Contact Info: 715-839-4934

COMPLETED Eau Claire River Trail

Barstow St to Farwell St, South side of Eau Claire River

Proposed Work: Erosion control, grading, removing the existing bituminous or gravel surface, common excavation, 6-inch crushed aggregate base course, sawing, 5-inch concrete pavement, retaining wall installation, pipe and tube railing installation, and type H lawn restoration.

Project Engineer & City Inspector: Christien Huppert

Contact Info: 715-839-4934

COMPLETED City Wide Milling & Asphalt Paving

Riverview Drive - Marquette St to Hwy 312

Proposed Work: Milling of Bituminous Pavement, Spot repair of; curb and gutter, driveway approaches, and sidewalks, Bituminous pavement, Pavement marking, and Restoration

Proposed Work: Milling of Bituminous Pavement, Spot repair of; curb and gutter, driveway approaches, and sidewalks, Bituminous pavement, Pavement marking, and Restoration

City Engineer: Tim Pluth

City Inspector: Cody Thiede

Contact Info: 715-839-4934

COMPLETED City Wide Milling and Asphalt Paving

Seymour Road - Starr Avenue to East 250 feet

Proposed Work: Milling of Bituminous Pavement, Spot repair of; curb and gutter, driveway approaches, and sidewalks, Bituminous pavement, Pavement marking, and Restoration

City Engineer: Tim Pluth

City Inspector: Cody Thiede

Contact Info: 715-839-4934

Completed - City Wide Milling and Asphalt Paving

SW Dog Park - Driveway off of Ferry St

Proposed Work: Fine grading, Bituminous pavement, Pavement marking, and Restoration

City Engineer: Tim Pluth

City Inspector: Cody Thiede

Contact Info: 715-839-4934

Completed - Melby Street Reconstuction

Anderson Dr to Hastings Way

A 5-foot-wide concrete sidewalk along the north side of Melby Street.

Project Engineer: Russell Johnson

City Inspector: Ben Nauertz

Contact Info : 715-839-4934

Completed - Chippewa River Trail

1st Ave to Grand Ave Plaza, West side of Chippewa River

Proposed Work: Erosion control, grading, removing the existing bituminous or gravel surface, common excavation, 6-inch crushed aggregate base course, sawing, 6-inch concrete pavement, electrical, and type H lawn restoration.

Project Engineer & City Inspector: Christien Huppert

Contact Info: 715-839-4934

Take a Closer Look at the On-Going Projects

Project Status as of November 3, 2022

Project 2022-02, Jeffers Road Reconstruction

Jeffers Road - Phase 1

Green Park Dr to County Line Road

Proposed Work: Removing the existing asphalt surface, removing curb and gutter, sanitary sewer installation, sanitary services, water main installation, water services, storm sewer installation, grading and graveling, new asphalt surface, new curb and gutter, new sidewalk and multi-use trail.


PROJECTED PROJECTS

5 YEAR CAPITAL IMPROVEMENT

FREQUENTLY ASKED QUESTIONS

If you have additional questions regarding any information on this page please reach out to the Engineering Department:

Telephone: 715-839-4934 Monday - Friday : 8am - 5pm Email:  engineering@eauclairewi.gov 

Visit us at City Hall - Engineering Department - 203 S Farwell St, Eau Claire, WI