
Mass Central Rail Trail
Feasibility Study Overview
Continue scrolling down the page or use the navigation bar above to learn more about the project. Mobile users, please rotate your device to landscape mode to ensure the best user experience.
Project Background
Relocation of CMRR, Clinton, June 2, 1902
Massachusetts Central Railroad (MCRR) originally ran from Boston west 104 miles to Northampton.
Vision for the Mass Central Rail Trail (MCRT):
- Convert as much of the original 104-mile rail corridor as possible to an east-west, off-road, shared use path/greenway connecting Northampton to Boston.
MCRT forms several critical links for the Commonwealth’s trail and greenway system in numerous visions and statewide planning documents, including:
- Massachusetts Department of Transportation’s (MassDOT’s) statewide Bike and Pedestrian Plans
- Department of Conservation & Recreation’s (DCR’s) Commonwealth Connections
- Various local and regional plans
Study Purpose
Project Graphics
Use the right arrow to advance the project graphics slideshow.
Feasibility Study Segments
Project Map
The following map is interactive, tap the map to activate it. Use + to zoom in and click a subsegment to get more information. To view a detailed map of the proposed changes of a specific subsegment click on "Map PDF Link" next to the subsegment name.
MCRT Interactive Map
Comment Form
Thank you for taking the time to review project materials. The comment period for this study has concluded.