Dorchester
Review of the Climate Ready Boston Initiative
Review of the Climate Ready Boston Initiative
The Design Flood Elevation for Moakley Park, Bayside and Harbor Point is 16.2 feet NAVD88.
The Design Flood Elevation for Morrissey Boulevard and Savin Hill is 16.1 feet NAVD88.
The Design Flood Elevation for Morrissey Boulevard (South) is 16.1 feet NAVD88. The Design Flood Elevation from Victory Park to Tenean Beach is 16.0 feet NAVD88.
Design Flood Elevation of the road would be 12.5 feet NAVD88. Additional building level adaption would be necessary.
Design Flood Elevation of the road would be 14.4 feet NAVD88.
Design Flood Elevation of the road would be 14.4 feet NAVD88.