Evangeline Corridor Forward
An Economic Action Plan For Advancing the Community's Vision
Cover page of Economic Action Plan
Overview
The Evangeline Corridor Economic Action Plan builds on a year-long process of targeted stakeholder and community engagement, economic and technical research, and urban design and planning, along the proposed I-49 Connector in Lafayette. It integrates key components of multiple previous plans, engagement efforts, and ongoing investments along the corridor to develop a comprehensive strategy for economic development. An outcome of the Evangeline Corridor Economic Action Plan is the identification of and conceptual plans for several “catalyst sites” within the corridor. Most of these sites are under private ownership. Accordingly, the ideas and recommendations within this plan are derived from community and stakeholder input, integrate market conditions and economic opportunities, and are intended to initiate conversations with landowners and prospective project partners, with the hope of realizing new developments which are beneficial to owners, surrounding neighborhoods, project partners, and Lafayette as a whole.
Catalytic Project Sites
The above diagrammatic map depicts the approximate locations of the eight Catalyst Sites along the future I-49 corridor, south of I-10 and east of downtown Lafayette.
The eight Catalytic Project Sites form a system of physical and programmatic improvements along the Evangeline Corridor to stitch communities back together. These projects employ the following strategies to achieve positive impacts:
- Pedestrian Access and Flow
- Design Excellence
- Equitable Development
- Real Estate Investment
- Retail and Business Activities
- Housing Production
- Open Spaces
Detailed information for each of these Catalytic Project Sites is presented below. Note that these conceptual plans were crafted with respect to five overarching Project Goals which were refined through intentional local research and stakeholder engagement efforts early in the process. Reviewing the full Corridor Action Plan document provided by Lafayette Consolidated Government is recommended.
Tour Project Sites
01 / 08
1
Simcoe Triangle
Public land for public good
2
Downtown Connection
A new front door to the heart of the city
3
Boulevard South
A center of gravity along the new boulevard
4
Donlon Triangle
A healthy community for aging in place
5
McComb-Veazey Central
A cultural campus reimagined
6
MLK Jr. Plaza
A new live-work-play experience
7
Jefferson Intersection
Bridging and nourishing the communities
8
Plan Patterson
A vibrant and livable community
Project 1 — Simcoe Triangle
Public land for public good
This redevelopment vision leverages land owned by the Lafayette Consolidated Government and builds on the community's goal to build mixed-use, mixed-income development with access to vibrant open space and art amenities in the area.
Location
East of the proposed I-49 Connector between Simcoe Street and the existing SE Evangeline Throughway and between Jefferson Street to the south and E 3rd Street to the north.
Proposed Uses
- 123k SF of new development (mixed-use, commercial/amenities, healthcare)
- 72 new housing units
- 0.3 acre of new open space
Related Capital Projects
- Jefferson Street Improvement
- Surrey Street Streetscape Improvement
Phasing Considerations
LCG Ownership of land and distance from I-49 construction enables early implementation, with planning able to commence upon release of the Action Plan.
Simcoe Triangle Zoning Map
Redevelopment Vision
Simcoe Triangle Vision
Existing Conditions
- Land Acreage: 3 acres of total land, with an average size per parcel of 0.3 acre. The site includes one (0.5 acre) vacant parcel, one (0.3 acre) adjudicated property, and 7 parcels (2.5 acre) of LCG-owned property.
- LCG retains ownership of the two blocks of parcels zoned as PI-L, which include the Greenhouse Senior Center and the Lafayette Senior Arts Studio.
- Current Zoning: CH Commercial Heavy and PI-L Public Institutional Light.
Strategic First Moves
Early Actions
- Assess and/or manage a development partner solicitation (RFP) process and package; determine the terms that LCG can offer (land control, building programs, and any incentives).
- Improve municipal owned properties like the Rose and Greenhouse and activate and improve Veterans Park and/or other existing open space in the surrounding area to increase vibrancy and market demand.
Zoning
- The CH district currently restricts density to 25 units per acre. To support a higher density on site, the Action Plan recommends transitioning to a CM-2 (Commercial Mixed) designation to permit increased residential density.
- The Action Plan recommends promoting "A" Development types in accordance with the Lafayette Development Code (LDC) to achieve a more compact and accessible built form.
Infrastructure
- Advocate for the construction of Jefferson St redesign, sidewalk, and bike paths per the site plans.
- Coordinate with LUS and DOTD for utility improvements along Jefferson (upsizing water pipe to 12" from Boulevard to Sterling and placing electric utilities underground).
- Connect the health facilities on E 3rd Street to Simcoe Triangle via improved pedestrian amenities such as crosswalks, pavers, etc.
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Simcoe Triangle Photo Collage
Simcoe Triangle Vision Rendering
Project 2 — Downtown Connection
A new front door to the heart of the city
This redevelopment vision fulfills the community’s vision to build better connection between Downtown and McComb-Veazey by investing in open space, pedestrian access, and mixed-use development
Location
Northern end - along Jefferson Street between Cypress Street and the proposed I-49 Connector. Southern end - east of the existing rail line to I-49 and north-south between Jefferson Street and 11th Street.
Proposed Uses
- 167k SF of new development (mixed-use, F&B, entertainment)
- 74 new housing units
- 9 acres of new open space
Related Capital Projects
- Jefferson Street Improvement
- 6th Street Improvement
Phasing Considerations
- The planning and development for the major mixed-use development can be kicked off upon the completion of the Action Plan.
- The new park is adjacent to the proposed I-49, hence while the planning can start sooner, the development will need to be coordinated with the I-49 timeline.
Downtown Connection Zoning Map
Redevelopment Vision
Downtown Connection Vision
Existing Conditions
- Land Acreage: North of Jefferson - close to 3 acres, with an average size per parcel of 0.2 acre, including one (0.1 acre) vacant parcel and 6 parcels (1.5 acre) of DOTD-owned property. South of Jefferson – 9 acres, with an 8-acre parcel, two four-acre parcels, and nine parcels with an average size of 0.2 acres, including two (8 acres) vacant parcels.
- Current Zoning: D Downtown and IL Industrial Light.
Strategic First Moves
Early Actions
- Continue working with DDA to create a vibrant park district that includes housing, retail, art, and open space programming.
- Coordinate with DOTD to get an easement or lease to use space under the viaduct for programming, activations, parking, and other uses.
- Pursue a Quiet Zone designation from the Federal Railroad Administration for the railway.
Zoning
D Downtown supports the redevelopment vision. Rezoning the northern parcel of the site that lands within the IL district to the neighboring D designation is recommended to better support the redevelopment vision. Rezoning the southern IL parcels to a PI (Public/Institutional) district is recommended to provide flexibility for a wide range of potential public or institutional facilities.
Infrastructure
- Improve 6th St to enhance experience and access to Rosa Parks Transportation Center. Mirror facilities east of tracks to some degree with respect to street improvements.
- Extend Jefferson St and 3rd St improvements across Blvd and I-49 to make a cohesive complete streets template. Reconstruct Grant St to mimic the downtown area.
- Advocate for the construction of Jefferson St redesign, sidewalk, and bike paths per the site plans.
- Monitor the impact of I-49 construction on power line relocation and drainage improvement.
Downtown Connection (1) Photo Collage
Downtown Connection (2) Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Downtown Connection Vision Rendering
Project 3 — Boulevard South
A center of gravity along the new boulevard
This redevelopment vision reactivates underutilized land with an active streetscape of community-focused businesses, neighborhood amenities, and open space, shaping a new, thriving Boulevard.
Location
Between Louisiana Avenue and 12th Street and between the proposed I-49 Connector and Plum Street.
Proposed Uses
- 234k SF of new development (mixed-use, community facility, makerspace, light industrial, retail, neighborhood amenities)
- 137 new housing units
- 2 acres of new open space
Related Capital Project
Johnston Street Improvement
Phasing Considerations
- Street redesign for this portion of the Grand Blvd can be prioritized and implemented early, which enables the kickoff for the planning of the parcels on the east side of the Blvd.
- The park and the larger proposed mixed-use development abutting the I-49 can be coordinated alongside the DOTD timeline.
Boulevard South Zoning Map
Redevelopment Vision
Boulevard South Vision
Existing Conditions
- Land Acreage: 7 acres of total land, with an average size per parcel of 0.2 acre, including over 2.5 acres of vacant land across 19 individual parcels, close to an acre of land containing three adjudicated property parcels, and two parcels (1.2 acre) of DOTD-owned property.
- Current Zoning: CH Commercial Heavy and IL Industrial Light.
Strategic First Moves
Early Actions
- Conduct multimodal access planning study. Invest in quality and accessible bus stops on Grand Blvd and pedestrian crossings below Johnston St.
- Improve Johnston St and Louisiana Ave pedestrian access.
- Work on a land assembly strategy with property owners and conduct a master plan for the park - community center – makerspace development, including speaking to the University as a potential partner.
Zoning
- The Action Plan recommends a rezoning of the two CH blocks to a MN-2 (Mixed-Use Neighborhood) designation, enabling higher residential density and improving the transition between adjacent residential areas and the new commercial corridor. To achieve the proposed uses, the Action Plan recommends rezoning the two IL blocks to a CM-2 (Commercial Mixed) designation.
- The Action Plan recommends promoting "A" Development types in accordance with the Lafayette Development Code (LDC) to achieve a more compact and accessible built form.
Infrastructure
- Coordinate Johnston Street redesign, sidewalk, and bike paths per the site plans. Conduct detailed planning for multimodal access.
- For sewage, the development west of Blvd will likely require a new 8" main.
- For water, the development west of Blvd will require relocation of mains along Blvd and cross streets and extension of the 16" main near 6th St to the south along Blvd and 6" lines looped for the development sites.
- Monitor the impact of I-49 construction on power line relocation and drainage improvement.
Boulevard South (1) Photo Collage
Boulevard South (2) Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Boulevard South Vision Rendering
Project 4 — Donlon Triangle
A healthy community for aging in place
This redevelopment vision activates underutilized land with senior housing and mixed-uses to meet the needs of underserved populations.
Location
Donlon Triangle is located between the proposed I-49 Connector, Donlon Avenue, and the railroad tracks to the south.
Proposed Uses
- 135k SF of new development (senior living, healthcare, mixed-use)
- 110 new housing units
- 1 acre of new open space
Related Capital Project
- Donlon Avenue Improvement (Proposed In This Plan)
Phasing Considerations
Distance from upcoming DOTD construction enables early implementation. The planning for this project could be started upon the release of the Action Plan.
Donlon Triangle Zoning Map
Redevelopment Vision
Donlon Triangle Vision
Existing Conditions
- Land Acreage: 9 acres of currently undeveloped space (all in one parcel).
- Current Zoning: CH Commercial Heavy.
Strategic First Moves
Early Actions
- Study Donlon Ave street and infrastructure improvements to increase desirability.
- Conduct a senior housing inventory and market study and identify potential partners.
- Engage healthcare providers and related partners to explore feasible and creative modes of providing services at this location.
- Increase and improve connectivity with street connection (Proposed In This Plan).
Zoning
- Additional capacity for residential density may be needed above what is allowed under a CH district. To support this, the Action Plan supports transitioning to a CM-2 (Commercial Mixed) designation.
- In addition, promoting "A" Development types in accordance with the Lafayette Development Code (LDC) would achieve a more compact and accessible built form.
Infrastructure
- Consider reconstructing Donlon Ave with a complete streets template (linear tree-scaped median looped to connect to the golf course/greenspace across the railroad).
- For water, relocation of the main under I-49 will be required. Connect the 16" main on the west side of I-49 to the 8" main on Moss with a 12" line.
- Electrical power primary lines require adjustment for I-49 construction. Consider extending the transmission line redundant circuit from the west side of I-49 to Moss along Donlon.
Donlon Triangle Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Project 5 — McComb-Veazey Central
A cultural campus reimagined
This redevelopment vision further amplifies the coterie’s impact with additional programmable venues, small businesses, outdoor spaces, and residential retrofits and redevelopment.
Location
Between Peach Street and Magnolia Street east to west and 11th Street to 13th Street north to south.
Proposed Uses
- 28k SF of new development (community facility, small business incubator, retail, infill housing)
- 18 new housing units
- 0.3 acre of new open space
Related Capital Project
12th Street Project
Phasing Considerations
Distance from upcoming DOTD construction enables early implementation. The planning for this project could be started upon the release of the Action Plan.
McComb-Veazey Central Zoning Map
Redevelopment Vision
McComb-Veazey Central Vision
Existing Conditions
- Land Acreage: 4.5 acres of total land, with an average parcel size of 0.1 acre. The site includes 7 adjudicated properties totaling about half an acre of land, one vacant property at 0.1 acre, and 2 LCG-owned properties totaling at 0.2 acre.
- Current Zoning: CM-1 Commercial mixed, RS-1 Residential Single Family.
Strategic First Moves
Early Actions
- Continue 12th Street improvement.
- Start conversations with property owners to test and refine the vision for new development.
- Meet with national and regional foundations and model organizations to inspire planning efforts and solicit funding support.
- Conduct federal, state and philanthropic grant search.
- Leverage and expand the adjudicated pilot program to have successes like the Community House.
Zoning
- CM-1 supports the redevelopment vision.
- Rezoning the northern parcel of the site that lands within the RS-1 district to the neighboring CM-1 designation is recommended to better support a small, neighborhood-scale multifamily product.
- In addition, promoting "A" Development types in accordance with the Lafayette Development Code (LDC) would achieve a more compact and accessible built form.
Infrastructure
- Improve Magnolia to meet a complete streets template.
- Construct 12th and Surrey St streetscape improvements.
McComb-Veazey Central Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
McComb-Veazey Central Vision Rendering
Project 6 — MLK Jr. Plaza
A new live-work-play exeperience
This redevelopment vision reimagines a shopping center parking lot to accommodate more vibrant activities, including commerce, strategic mixed-use development, and accessible neighborhood amenities.
Location
On the east side of the Parkway Shopping Center, abutting the proposed I-49 Connector and extending south to Martin Luther King Jr Drive.
Proposed Uses
- 152k SF of new development (mixed-use, retail, office)
- 85 new housing units
- 1 acre of new open space
Related Capital Project
- MLK Jr Drive Improvement
- Clifton Chenier Access Road
Phasing Considerations
- The MLK Jr Dr street realignment can be implemented as an early-medium term action item.
- The planning and development of the proposed mixed-use project shall be implemented after the street realignment and the determination of no impact from I-49 construction.
MLK Jr. Plaza Zoning Map
Redevelopment Vision
MLK Jr. Plaza Vision
Existing Conditions
- Land acreage: 14 acres of total land on the existing large parking lot, consisting of one 11-acre parcel and five other parcels averaging 0.8 acre per parcel.
- Current Zoning: CH Commercial Heavy.
Strategic First Moves
Early Actions
- Conduct a retail needs study with existing business owners and the surrounding community.
- Identify an anchor tenant for the new retail spaces to attract a range of users throughout the day.
- Coordinate and align design with the planned MLK Jr. Drive Street project.
Zoning
- The existing CH designation restricts density to 25 units per acre, which should be considered in future parcel subdivision and development. Given the proposed design, transitioning to a CM-2 (Commercial Mixed) or PD (Planned Development) designation may be beneficial to achieve the desired outcome.
- The Action Plan recommends promoting "A" Development types in accordance with the Lafayette Development Code (LDC) to achieve a more compact and accessible built form.
MLK Jr. Plaza Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
MLK Jr. Plaza Vision Rendering
Project 7 — Jefferson Intersection
Bridging and nourishing the communities
This redevelopment vision reestablishes pedestrian connections between Downtown and McComb-Veazey by proposing new mixed-use development, including a grocery store anchor, housing, and space for small businesses.
Location
North-south along the proposed Boulevard between Simcoe Street and Grand Boulevard and east to west from the proposed I-49 Connector to Magnolia Street.
Proposed Uses
- 402k SF of new development (mixed-use, grocery, small business retail, workforce development)
- 253 new housing units
- 2 acres of open space
Related Capital Project
- Jefferson Street Improvement
- 6th Street Improvement
Phasing Considerations
- LCG and partners should begin the study and advocacy for improved pedestrian infrastructure and street design upon release of the Action Plan.
- The planning for the sites on Jefferson Street along the east side of the Grand Blvd (grocery store, mixed-use, workforce) can kick off upon the release of the Action Plan, with construction to commence after the street redesign implementation.
- The planning for the I-49 abutting mixed-use projects can kick off upon the determination of no impact from highway construction.
Jefferson Intersection Zoning Map
Redevelopment Vision
Jefferson Intersection Vision
Existing Conditions
- Land Acreage: 10 acres of total land, with an average parcel size at 0.2 acre. The site includes about 1 acre of vacant property on seven individual parcels, under half an acre of adjudicated property on three individual parcels, and 1.3 acres of DOTD-owned property on 9 parcels.
- Current Zoning: CH Commercial Heavy and IL Industrial Light.
Strategic First Moves
Early Actions
- Meet with DOTD to assess the feasibility of safe and ample pedestrian crossing options (raised crosswalks, traffic calming techniques, and road diets) to ensure economic vibrancy and connectivity.
- Identify potential grocery tenant(s) and supply them with market insights and retail needs assessment.
- Work with LEDA, Workforce Investment Board, and local chambers and business groups to develop building specification based on program operations needs for the new workforce facility and small business hub.
Zoning
- The CH district currently restricts density to 25 units per acre. A MN-2 (Mixed-Use Neighborhood) designation would enable higher residential density and improve the transition between adjacent residential areas and the new commercial corridor.
- A CM-2 (Commercial Mixed) designation would likely be the most compatible with the proposed plan. The Action Plan recommends rezoning the blocks zoned IL to achieve the desired outcomes.
- The Action Plan recommends promoting "A" Development types in accordance with the Lafayette Development Code (LDC) to achieve a more compact and accessible built form.
Infrastructure
- Advocate for construction of pedestrian crossing and traffic calming features, Jefferson St redesign, sidewalk, and bike paths per the site plans. Conduct detailed planning for multimodal access.
- Create an active plaza on the northwestern edge of the Jefferson and Boulevard next to I-49 that acts as a destination and landmark and softens and provides identity to the western edge of the site.
- For sewer, upsize 8" along Jefferson to 12" (from Boulevard to Orange)
- Coordinate with LUS and DOTD for utility improvements along Jefferson (upsizing water pipe to 12" from Boulevard to Sterling and placing electric utilities underground).
- Monitor the impact of I-49 construction on power line relocation and drainage improvement.
Jefferson Intersection Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Jefferson Intersection Vision Rendering
Project 8 — Plan Patterson
A vibrant and livable community
This redevelopment vision sets in motion a comprehensive, community-informed planning process and reimagines this significant area as a residential node with neighborhood serving amenities.
Location
From Netta Street to the north, Patterson Street to the west, the proposed I-49 Connector to the east, and the single-family homes along Chalmette Drive and Berkley Avenue to the south.
Proposed Uses
- 270k SF of new development (multi-family, single-family, mixed-use, community facility)
- 194 new housing units
- 4 acres of new open space
Phasing Considerations
Site redevelopment is estimated to be part of a long-term vision. Stakeholders can begin outreach and planning for this project upon completion of the Action Plan.
Plan Patterson Zoning Map
Redevelopment Vision
Plan Patterson Vision
Existing Conditions
- Land Acreage: Over twenty acres of total land. The site includes over 4.5 acres of vacant land on one individual parcel. The other parcel is 16 acres.
- Current Zoning: CH Commercial Heavy.
Strategic First Moves
Early Actions
- Engage the majority landowner and hotel owners to explore a master planning process.
- Conduct a community engagement process to engage the surrounding neighborhood on needs and vision for the site.
Zoning
- The proposed uses align with the CH designation, with the exception of single-family detached units, which are not permitted under the CH zoning. Given the proposed design, transitioning to a PD (Planned Development) or MN (Mixed-Use Neighborhood) designation may be more beneficial.
- If any existing zoning designations are utilized, the Action Plan recommends promoting "A" Development types in accordance with the Lafayette Development Code (LDC) to achieve a more compact and accessible built form.
Infrastructure
- Improve access to commercial properties from I-49.
- Discourage cross-street from being used as a high-speed crossover with traffic calming features.
- Prevent commercial traffic from approaching Patterson Street.
Plan Patterson Photo Collage
The Economic Action Plan recognizes that landowners along the Evangeline Corridor seek multiple ways of maximizing their development potential; therefore, the Plan illustrates a redevelopment potential that integrates the community's vision for revitalization. Future DOTD land acquisition might further affect the site's development potential.
Community Partners and Consultant Team