Capital Works Projects 2024

Overview of the Major Capital Works Projects


The map below shows a list of all major capital works projects budgeted for 2024. Select a point on the map to view photos and project descriptions.

Lagoons Bypass Construction Phase 2

Phase 2 Construction of the lagoons project consisted of the install of new bypass piping, valves, control structures, and electrical at the site.  These upgrades bring our lagoons up to current standards for operation and ensures capacity for future growth of the City. The existing piping and control structure were at end of life and in need of replacement to ensure reliable operations of the lagoons system.  

 Project Status – Complete

Contractor – Copcan Civil LP

Lagoons Phase 3 - Berm and Dyke Upgrades

The Lagoons Phase 3 project will be the final stage of the upgrades to the lagoon structures and operations, Phase 3 will see the reconstruction of the berms of the lagoons, raising their height and armoring them along Jospeh creek to prevent erosion of the structures.

Project Status – Awarded

Contractor – Copcan Civil LP  

12th Avenue South Reconstruction

The 12 th  Avenue South Reconstruction project will take place on 12 th  Ave S from (2 nd  St S to 3 rd  St S) this project will remove and replace the old aging waterline, install new fire hydrants and services to each residential property. The work will also consist of upgraded drainage infrastructure, Paving and Sidewalks. Project Status – Under Construction

Contractor – Gally Equipment Services Ltd.

6th Street South Reconstruction

The 6 th  Street South Reconstruction Project will take place on 6 th  St S from (3 rd  Ave S to 5 th  Ave S) this project will remove and replace the old aging waterline, install new services to each residential property. The work will also consist of upgraded drainage infrastructure, Paving and Sidewalks.

 Project Status – Awarded

Contractor - Copcan Civil LP

Highway 95 Watermain Crossing

The Highway 95 Watermain crossing is the replacement of a critical section of the Cities water supply network, the old line crossing the highway was undersized for the area it serviced and was passed its effective service life, the pipe was in very poor condition and extremely likely to fail in a short timeline. The line was upgraded to from 200mm diameter to 300mm diameter pipe, the new pipe installed is PVC. The new line increases reliability of the water system in this area, as well provides better fire flow. Project Status – Complete

Contractor – Copcan Civil LP

Paving of Victoria Ave N

After a difficult year of freeze thaw cycles, significant sections of Victoria Avenue, Industrial Road 1, and 6th Street NW will see some major mill and fill patching work undertaken in the worst areas to extend the life of the roadway. Staff used our asset management and pavement management framework to identify these roadways for resurfacing in 2024.

The escalation of construction costs has significantly and negatively impacted the amount of resurfacing work the City is able to complete, compared to trends from 3 to 5 years ago.

 Project Status – Complete

Contractor – Terus Construction (dba. BA Blacktop Cranbrook)

Paving of 6th Street NW

After a difficult year of freeze thaw cycles, significant sections of Victoria Avenue, Industrial Road 1, and 6th Street NW will see some major mill and fill patching work undertaken in the worst areas to extend the life of the roadway. Staff used our asset management and pavement management framework to identify these roadways for resurfacing in 2024.

The escalation of construction costs has significantly and negatively impacted the amount of resurfacing work the City is able to complete, compared to trends from 3 to 5 years ago.

 Project Status – Complete

Contractor – Terus Construction (dba. BA Blacktop Cranbrook)