Construction Start Date

May 15, 2023

Anticipated Construction End Date

October 14, 2024

Review the Schedule of events below using our GIS Story Map. At the bottom of this page, immerse yourself within the interactive map showing city services and infrastructure that may be reconstructed over the course of the project. Allow location services on your mobile device to see your location on Main Street in relation to the reconstruction project. To immediately jump to the Interactive GIS Map  click here . This site is currently under development and will post ongoing changes to the project when new information becomes available.


A Story Map of Main Street's Makeover


Interactive Making Over Main Street App

Use the Layers button to toggle between existing features and the proposed features planned for the Main Street revitalization. Expand the application to full screen to visualize the project in finer detail including business names and underground infrastructure. Open the Interactive Map on your mobile device and enable location services to see yourself within the project's boundaries while reviewing the proposed changes.

Making Over Main Street Interactive Map


THE INFORMATION CONTAINED IN THIS APPLICATION MAY BE BASED UPON DATA PROVIDED BY OTHERS AND MAY NOT HAVE BEEN VERIFIED BY EITHER AS-CONSTRUCTED DRAWINGS OR AN ONTARIO LAND SURVEYOR. THE CITY OF NORTH BAY CANNOT ACCEPT RESPONSIBILITY FOR ERRORS OR OMISSIONS ON ANY INFORMATION SHOWN HEREIN. FIELD VERIFICATION, LAND SURVEYS OR EXCAVATION (WITH CITY APPROVALS) MAY BE REQUIRED TO DETERMINE ACTUAL LOCATION OF ANY AND ALL UTILITIES OR PROPERTY LINES.


Copyright 2023. City of North Bay

City of North Bay GIS

phone: 705 474 0400

email: NB_GIS@northbay.ca

200 McIntyre Street East

North Bay, Ontario

Canada P1B 8V6