2022 Residential Capital Maintenance Project
From February 2, 2022 to February 16, 2022, ACHD will be seeking feedback on the designs for each street from the public.
Welcome!
Thank you for joining us to learn more about the 2022 Residential Capital Maintenance Project. The purpose of this online information is to give you an opportunity to:
- LEARN about the project and review the designs.
- TELL US what you think.
Project Background
The Ada County Highway District (ACHD) will be rehabilitating several streets in your area as part of a locally funded project to improve pavement conditions and upgrade the streets for all users. To learn about other projects involved in this locally funded project, go to this link: achdidaho.org/washingtonimprovements
Work could include:
- Reconstructing streets or removing and replacing pavement to improve roadway conditions.
- Filling in sidewalk gaps to increase connectivity.
- Adding bulb-outs where appropriate to improve safety and comfort.
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA).
- Upgrading light pole fixtures and adding new streetlights to increase visibility at certain locations
- Possible Stormwater Improvements


Left photo before, right photo after
Project Purpose
- Improve pavement condition
- Increase connectivity for all users
- Improve safety and comfort
Roadway Improvements
Pavement improvements will include either reconstructing the entire roadway or removing and replacing the roadway surface with a process called milling. Both will provide a smoother, longer lasting roadway surface.
Pavement Milling
Pavement milling removes the roadway surface so new pavement can be installed. The milling machines use a large rotating drum to remove and grind the road surface. Once the base is properly prepared, a new asphalt surface is paved.
Map
Roadway Segments
Segments to be built in 2022
- West 3rd Street, Pine Avenue to the North End
- Broadway Avenue, East 3rd Street to East 6th Street
- Cherry Avenue, West 4th Street to Meridian Road
- Idaho Avenue, West 8th Street to Meridian Road
- Maple Avenue, West 1st Street to Meridian Road
Segments to be built in 2023
- West 2nd Street, Cherry Avenue to Cherry Lane
- West 4th Street, Broadway Avenue to Maple Avenue
Click the segment name to view exhibit
- New curb, gutter, sidewalk, pedestrian ramps, possible stormwater improvements, and upgraded lightpole fixtures.
- Upgraded pedestrian ramps and upgraded light pole fixtures.
- New curb, gutter, sidewalk, possible stormwater improvements, and pedestrian ramps.
- New pedestrian ramps, sidewalk, and upgraded light pole fixtures.
- New curb, gutter, sidewalk, pedestrian ramps, bulb-outs, and streetlights.
- New pedestrian ramps and upgraded light pole fixtures.
- New curb, gutter, sidewalk, and pedestrian ramp
Project Timeline
2021
Begin design
2022
Seek public input (we are here)
Summer 2022
Construction of 2022 segments begins
Spring 2023
Construction of 2023 segments begins
Give us your Feedback
Please take the survey below: While your feedback is always welcome, it can be best used if received by February 16, 2022.
2022 Residential Capital Maintenance Project
Contact
For additional information or comments contact
Cody Homan, PE ACHD Senior Project Manager | 208-387-6109 | TTY: 1-800-377-3529 | projects@achdidaho.org
ACHD will happily arrange for a Spanish or additional language accommodation, and other accommodation upon request. To learn more please contact ACHD at (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org
ACHD puede proporcionarle en las próximas reuniones de participación pública, traducción en español o en otro idioma y cualquier adaptación especial, si usted lo requiere. Para más información comuníquese con ACHD al número (208) 387-6100 | TTY 1-800-377-3529 projects@achdidaho.org